For Manufacturers Who Want to Know Their Material Cost
Connect bills of material, the production process and stock — so the material cost of each finished unit stops being an estimate.
The challenges manufacturers share
We put this configuration together after seeing the same pattern repeat across similar businesses.
- Material cost per finished unit is worked out with a rough estimate.
- Raw material usage is not recorded as production runs.
- The material composition of each product is remembered, not documented.
- Raw materials and finished goods are tracked in separate places.
The modules that matter most
You do not have to switch everything on at once. Start with the most urgent and add the rest later.
What changes in day-to-day operations
The changes that show up fastest once the system is running.
Selling prices have a basis
Material cost per unit is calculated from the average cost of what was actually consumed, not assumed.
Raw materials stop leaking
Every issue of material is tied to a specific production record.
Finished goods land straight in stock
Production output is available to sell without re-entry.
How to get started
From the first conversation to your team using it day to day.
Map your needs
We walk through how you work today and identify which modules matter most right now.
Configure the system
Master data, access rights and approval flows are set up to match how your business actually runs.
Migrate your data
Product, customer, supplier and opening-balance data is moved across from spreadsheets or your old system.
Training & support
Your team is trained on the system, and we stay close through the first stretch of live use.
Ready to get your operations in order?
Try Onega ERP free for 14 days, or request a demo shaped around your workflow.
No credit card required. We respond within 24 business hours.